Temporary works and traffic management measures were implemented to maintain pedestrian access and safeguard public areas throughout the construction period. All works were sequenced to accommodate basement waterproofing requirements and structural load transfer through the pile-supported frame. Close collaboration with the client and design team ensured that construction tolerances and programme milestones were consistently met despite the site’s logistical constraints.

Project gallery.

SSIP accreditationSMAS accreditationISO accreditationConstructionline Gold accreditationCHAS accreditationNDTG accreditationISO45001 accreditation