Scope of works.
Duration 16 WEEKS
The demolition of an existing building and the construction of a basement and two storey concrete frame for a new dwelling house. Works included the construction of a piling mat, installation of sheet piles and a reduced level dig to form the basement box. All steel fixing, shuttering and concrete work were carried out by our in-house operatives. Works were completed within a 16-week programme.
DEMOLITION | BASEMENT CONSTRUCTION | CONCRETE FRAMEWORK | STEEL FIXINGS | SHUTTERING & CONCRETE WORK | IN-HOUSE OPERATIVES
O'Connell Building Contractors successfully executed a comprehensive groundworks project at Long Acre, which involved the demolition of an existing dwelling. The project encompassed the excavation and construction of a basement, as well as the erection of a two-story concrete frame. To support the new structure, 1,500 cubic meters of earth were excavated, showcasing our capability in handling large-scale earthworks. The construction also included the installation of sheet piled retaining walls to ensure the stability and integrity of the site. Additionally, we managed the associated drainage and services, integrating them with the new development. By incorporating retaining walls, we ensured the project's structural soundness and safety. The successful completion of the Long Acre project highlights our commitment to quality and client satisfaction. Through planning and execution, we achieved all project objectives within the timeline. O'Connell Building Contractors continues to set benchmarks in the construction industry, particularly in challenging groundwork and excavation projects.