The range and scope of our past projects is wide and varied across the public & private sectors.
Demolition.
Read more
Basildon Hospital
The project involved installing a 2.4m-high plywood boundary hoarding, carrying out a full soft strip, removing redundant MEP systems, assisting with asbestos removal, and demolishing the structures down to the ground-bearing slab. All footings, foundations, and basements were removed, and all arisings were crushed on-site to 6F5 specification.
Groundworks.
Read more
Regent College, Rayners Lane
The Regent College project consists of a single-storey waterproof concrete basement with a contiguous piled wall and capping beam, topped by a five-storey frame. O'Connells were responsible for the concrete frame package including all relevant groundworks and drainage installation.
Civils.
Read more
Queen Victoria Hospital
We successfully delivered complex infrastructure works at the live Queen Victoria Hospital site without disrupting clinical operations. Careful planning, out-of-hours working, and close NHS coordination ensured early programme delivery. Local employment and strong supply chain management boosted efficiency and generated £50,000 in community economic value.
Our work process.
There are several essential steps to take before embarking on a project. Here are five key steps to ensure a successful project execution.